Cleanroom Services
- Cleanroom Construction
- Cleanroom HVAC Layouts
- Cleanroom CAD Architectural Drawings
- Schedules
- Cleanroom Piping
- Cleanroom Ductwork
- Cleanroom Electrical
- HVAC Panel Preparation
- Schedules & Clean Protocols
- Clean room Load Calculations
- Efficiency Study and Power Requirements
- Cleanroom Upgrades
- Equipment Selection/Location
- Local City/Municipal Permitting Preparation
- Classification to any cleanroom standard
with accompanying certificate:
- US FED STD 209E cleanroom standards
Class 1-100,000
- ISO 14644-1 cleanroom standards 1-9
- BS 5295 cleanroom standards 1-4
- Fast Particle Counts: e.g. a 10x20'
Cleanroom will not exceed 1 hour
- Free travel to many Chicagoland
Locations
- Travel Fees outside of Chicagoland
extra
- Cleanroom Ceiling Fan Filter Unit Testing/Certification
- Recommendation for HEPA Filter Replacement
- Test Air Flow into the Cleanroom
- No travel charge to most Chicagoland locations
- Travel charge outside of Chicagoland area would apply
- Cleanroom Cleaning
- Cleanroom sterilization
- "Like-New" cleaning & restoration of ceiling, walls & floor with
touch-up painting if necessary
|
|