 | Cleanroom Construction |
 | Cleanroom HVAC Layouts |
 | Cleanroom CAD Architectural Drawings |
 | Schedules |
 | Cleanroom Piping |
 | Cleanroom Ductwork |
 | Cleanroom Electrical |
 | HVAC Panel Preparation |
 | Schedules & Clean Protocols |
 | Clean room Load Calculations |
 | Efficiency Study and Power Requirements |
 | Cleanroom Upgrades |
 | Equipment Selection/Location |
 | Local City/Municipal Permitting Preparation |
 | Classification to any cleanroom standard
with accompanying certificate:
 | USP 797 Consulting and design |
 | US FED STD 209E cleanroom standards
Class 1-100,000 |
 | ISO 14644-1 cleanroom standards 1-9 |
 | BS 5295 cleanroom standards 1-4 |
 | Fast Particle Counts: e.g. a 10x20'
Cleanroom will not exceed 1 hour |
 | Free travel to many Chicagoland
Locations |
 | Travel Fees outside of Chicagoland
extra |
|
 | Cleanroom Ceiling Fan Filter Unit Testing/Certification
 | Recommendation for HEPA Filter Replacement |
 | Test Air Flow into the Cleanroom |
 | No travel charge to most Chicagoland locations |
 | Travel charge outside of Chicagoland area would apply |
|
 | Cleanroom Cleaning
 | Cleanroom sterilization |
 | "Like-New" cleaning & restoration of ceiling, walls & floor with
touch-up painting if necessary |
|
 | Contact Us for pricing |